Hiranandani Aqua Suites opens beachside studio and 1 BHK homes at Bagmala, Alibaug
Published
Hiranandani Communities, the township arm of the Hiranandani Group, has launched Hiranandani Aqua Suites, a new residential project in Bagmala, Nagaon, on the Alibaug coast in Raigad district, Maharashtra. The project is now at the New Launch stage and is registered with Maharashtra RERA under number PR1270002501600.
The scheme comprises two buildings with 150 homes spread across 5.72 acres within the Hiranandani Sands coastal township. The homes are compact beachside studio suites and 1 BHK apartments, aimed at buyers looking for a second home or a property that is easy to maintain and let out. Studio suites are offered from 350 to 395 sq ft and are priced from Rs 95 lakh, while 1 BHK apartments range from 520 to 530 sq ft and start at Rs 1.45 crore. The developer has set completion for December 2030.
Project details for buyers
Aqua Suites sits within a township that the developer describes as spanning 225 acres with about 3.5 km of beachfront near Nagaon Beach. Each home is designed around the coastal setting, with large living-area windows that take in views of the sea. Finishes include high-quality flooring in the living and bedroom areas, a modular kitchen with premium fittings and durable countertops, and bathrooms fitted with premium sanitary ware, designer fixtures and anti-skid flooring.
The residential amenities planned for the project include:
- A luxury clubhouse for social events, with a mini theatre, cafeteria, community hall and indoor games room
- A swimming pool and a gymnasium with modern fitness equipment
- A jogging track, skating rink, kids' play area and amphitheatre
- A meditation pod and landscaped gardens with a step garden
- 24/7 security with CCTV cameras and trained guards, along with fire detection and prevention systems
- Power backup for common areas and parking for residents and guests
Home loans are expected to be available from leading banks once the project is launched, and the developer's wider Sands township is described as approved by several major lenders.
Location and connectivity
Bagmala lies a short distance from several coastal landmarks. Nagaon Beach is about 2.3 km away, Chaul about 1.6 km and Mandwa Jetty around 4 km, based on township-level figures. Alibaug city centre is a short drive, and the Mumbai-Alibaug Highway, the Nagaon Beach Road and the road link to Pune provide access to the wider region. The Mumbai Trans Harbour Link has shortened the road journey from Navi Mumbai, and travel from Mumbai is possible by road or by ferry.
Several infrastructure projects are expected to improve access to the Alibaug belt in the coming years. The Virar-Alibaug Multimodal Corridor is under construction, with Phase I expected by 2027 and full operation by 2030. The proposed Virar-Alibaug metro, a 136 km route with 40 stations, is at the feasibility study stage. The Mumbai-Goa highway expansion is progressing with rolling completion in 2026 and 2027, and Navi Mumbai International Airport serves as a nearby air gateway.
About the developer
Hiranandani Communities operates under the Hiranandani Group, which was founded in 1978 by Niranjan and Surendra Hiranandani and is headquartered in Mumbai. The group's company releases cite about 35 million sq ft of homes delivered and 15 million sq ft of offices and retail space. Its footprint spans Mumbai, Thane, Panvel, Chennai, Pune through a joint venture, Alibaug, Khandala, Ahmedabad and GIFT City.
In Panvel, the group has delivered Forest Enclave and Garden Enclave at Fortune City, together more than 2,300 apartments. Highlands South at Hiranandani Parks in Oragadam, Chennai, offers more than 800 apartments. Hiranandani Estate in Thane and Hiranandani Heritage in Mumbai are also among its delivered developments. In Bagmala, the group's Aqua Bliss offers 3 BHK homes from Rs 2.20 crore, and Hiranandani Estates in Alibaug includes villas and estates of 5,000 to 12,000 sq ft.
What comes next
With the project at the New Launch stage, buyers can expect the developer to move forward with the booking process and the construction schedule toward the December 2030 completion date. The developer has indicated that a detailed price list and payment structure will be announced as the launch progresses, and the broader Sands township is expected to add a planned retail and commercial belt on site. Buyers interested in the scheme can follow the project page for updates on availability and offers.
